[Construction Case] Long-distance and Curved Pushing Work with Small Soil Cover
Equipped with enhanced shell bits that guarantee long-distance propulsion! Introducing examples of construction work.
We would like to introduce a case study of long-distance and curved thrust construction for a small soil cover, commissioned by Dazaifu City, Fukuoka Prefecture. The project involves the construction of a rainwater drainage system aimed at alleviating flooding damage. Additionally, it features high-precision construction using a real-time measurement system. 【Project Overview】 ■ Project Name: Construction of the Okuzono Rainwater Drainage System, Section 23-1 ■ Location: 1-chome, Gojō, Dazaifu City, Fukuoka Prefecture ■ Client: Dazaifu City ■ Contractor: Kido and Miyahara Joint Construction Enterprise ■ Method: Ultimate Slurry Shield Method ■ Pipe Diameter: Ф1800mm ■ Thrust Length: L=583.7m ■ Curve: R=192m CL=211m at one location ■ Soil Cover: H=1.65m (minimum soil cover) (0.77D) (D=pipe outer diameter) ■ Soil Type: Silty gravel ■ Construction Period: March 2012 to March 2013 *For more details, please feel free to contact us.
- Company:機動建設工業
- Price:Other